翻訳と辞書
Words near each other
・ Brüeler Bach
・ Brügg, Bern
・ Brügge
・ Brügge (Westfalen) station
・ Brüggen
・ Brüggen (Leine)
・ Brüggen Glacier
・ Brüggen, Germany
・ Brügger
・ Brügger & Thomet
・ Brügger & Thomet APC9
・ Brügger & Thomet APR
・ Brügger & Thomet GL-06
・ Brügger & Thomet MP9
・ Brügger Colibri
Brügge–Lüdenscheid railway
・ Brügglen
・ Brüheim
・ Brühl
・ Brühl (Baden)
・ Brühl (family)
・ Brühl (Leipzig)
・ Brühl (Rhineland)
・ Brühl (surname)
・ Brühl palace
・ Brühl Palace, Warsaw
・ Brühl station
・ Brühl train disaster
・ Brühl's Terrace
・ Brühlbach


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Brügge–Lüdenscheid railway : ウィキペディア英語版
Brügge–Lüdenscheid railway

}}
The Brügge–Lüdenscheid railway is a single-track, non-electrified branch line in the German state of North Rhine-Westphalia. The 7 km-long line climbs from Brügge (Westfalen) station on the Hagen–Dieringhausen railway to Lüdenscheid station.
== History ==

Brügge gained a rail connection in 1874 with the opening of the Dahl–Brügge section of the Hagen–Dieringhausen railway (also called the ''Volmetalbahn'': "Volme Valley Railway"). Lüdenscheid sought a connection to this line, but the design of a line to serve it was far from easy because of the difficult topography. Despite a maximum grade of 1:36, a 412 m long tunnel had to be built near Lüdenscheid.
The 6.5 km long line was opened on 15 July 1880 by the Prussian state railways. From 1904, there was a transfer point at Wehberg station to the Altena District Railway (''Kreis Altenaer Eisenbahn'', KAE), which operated until 1967. However, it was used only for freight. For passenger transport, there was a stairway between the District Railway station and the state railway station, which was 18 metres higher.
At the beginning of the 20th century there were plans to connect the Hagen–Dieringhausen railway with the Plettenberg–Herscheid railway, thus creating a connection between the Volme and Lenne valleys. However, during the First World War work was abandoned due to the high construction costs, although the earthworks had already been built through Herscheid. In the 1920s, the municipality of Herscheid tried to revive this project, but it was abandoned with the onset of hyperinflation. Later, road transport became dominant in Germany. The section would have been about 33.9 km long. The mountainous topography in Sauerland meant that the plans included large tunnels, bridges and underpasses, such as on the ridge between the Verse and the Ahe valleys, where a 650 metre long-tunnel was planned. Another 300 metre-long tunnel would have run in Herscheid from Helle to below the shooting range. A total of four tunnels were planned with a total length of 2,175 metres. The estimated cost for the tunnels amounted to 1.84 million marks. The total cost of the railway line was estimated by the Prussian state railways to be 9.8 million marks or 289,100 marks per kilometre of line.

Due to its steepness, three class 96 locomotives were stationed at the Brügge depot (Bw Brügge) for use on the line in the 1930s.
From 1965 to September 1994 the Brügge–Lüdenscheid line and the Volme Valley Railway was served by push-pull trains consisting of class 212 diesel locomotives (stationed in Hagen) and two or three, mainly Silberling, carriages. Until 1979 there was also a railbus shuttle between Lüdenscheid station and Brügge station, connecting with the express trains between Cologne and Hagen. A class 628.4 diesel railcar operated on the line from September 1994 to 30 May 1999.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Brügge–Lüdenscheid railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.